Construction of new Econo-Cabin
model  near Steelville, Missouri

Click here to view the slide show of images or select a single image below to enlarge.
Digging the foundation hole.The footings are poured.The foundation walls begin to be formed.The foundation walls are formed.
Reinforcing steel is in place ready for the concrete.The forms are filled with concrete.The forms are filled with concrete.The foundation walls are complete.
The logs arrive from the mill.The logs are stored on site and protected from the weather until needed.Subfloor framing begins.Subfloor framing nearing completion.
The log stack begins on the finished subfloor.The logs begin to rise higher.Door and window openings are installed as the logs rise higher.The logs are stacked and the main house roof is framed.
Different angle of the roof framing.The decking is going down on the roof...and so is the sun.Felt is on the main roof. The front porch will begin to rise next.Close up of butt & pass corners
The porch is roof dryed- inInterior view of log walls and roof framing
Interior Gathering RoomInterior Kitchenette
Interior KitchenetteExterior Rear ElevationExterior Front ElevationExterior Front Elevation
Exterior Side Elevation