Constructon of our sales model near Steelville, Missouri

  • Digging the foundation hole.
  • The footings are poured.
  • The foundation walls begin to be formed.
  • The foundation walls are formed.
  • Reinforcing steel is in place ready for the concrete.
  • The forms are filled with concrete.
  • The forms are filled with concrete.
  • The foundation walls are complete.
  • The logs arrive from the mill.
  • The logs are stored on site and protected from the weather until needed.
  • Subfloor framing begins.
  • Subfloor framing nearing completion.
  • The log stack begins on the finished subfloor.
  • The logs begin to rise higher.
  • Door and window openings are installed as the logs rise higher.
  • The logs are stacked and the main house roof is framed.
  • Different angle of the roof framing.
  • The decking is going down on the roof...and so is the sun.
  • Felt is on the main roof. The front porch will begin to rise next.
  • Close up of butt & pass corners
  • The porch is roof dryed- in
  • Interior view of log walls and roof framing
  • Interior Gathering Room
  • Interior Kitchenette
  • Interior Kitchenette
  • Exterior Rear Elevation
  • Exterior Front Elevation
  • Exterior Front Elevation
  • Exterior Side Elevation
<<
Digging the foundation hole.
>>

Digging the foundation hole.

 
 
573-775-5647 ~ PO Box 1489 Steelville, Missouri, 65565 ~ Privacy Policy