Restoration near Beaufort, Missouri

  • Front elevation of log home before restoration begins. We will be giving it quite a face lift.
  • Right side elevation of log home before restoration begins. This entire wall will need to be replaced due to lack of proper maintenance.
  • Rear elevation of log home before restoration begins. Several logs will require replacement or refacing. We will also be adding a porch.
  • Left side elevation of log home before restoration begins. Several logs will require replacement or refacing. We will also extend the gable roof overhang to better protect the walls.
  • The rear log wall has been prepped for coatings and the porch deck is in place. This shed dormer will also be replaced with a gable dormer and we will be installing a new metal roof.
  • The log replacement is complete on the left side of the home. Also notice the heavy timber roof extension in progress. The prep work is now beginning to remove the old coatings. All of these windows will also be replaced.
  • Front elevation after restoration is complete
  • Left side elevation after restoration is complete
  • Right side elevation after restoration is complete
  • Rear elevation after restoration is complete
  • New porch ceiling after restoration is complete
<<
Front elevation of log home before restoration begins. We will be giving it quite a face lift.
>>

Front elevation of log home before restoration begins. We will be giving it quite a face lift.

 
 
573-775-5647 ~ PO Box 1489 Steelville, Missouri, 65565 ~ Privacy Policy